HomeSite Readiness

Know what needs checking before the farm is designed.

Growing space is one part of site readiness. Organize the available evidence about water, utilities, working areas and interruptions, then identify the people needed to assess the actual project.

COAgri concept of a hydroponic farm with growing and working areas
COAgri concept imagery

Look beyond the growing footprint.

Nutrient-water delivery, electrical supply, access for equipment care and space for harvest work all belong in the site discussion. Prepare the facts available now and identify who should review the actual conditions.

Site preparation worksheet β€” evidence to organize before assessment
TopicEvidence or question to prepareReview responsibility to identify
WaterProposed source, available test evidence and unresolved suitability questions.Appropriate water or growing specialist.
Electrical supplyDocumented supply, equipment loads still to determine and interruption history.Qualified electrical practitioner.
Water routesProposed supply, return, drainage, reuse or discharge arrangements.Relevant design or site practitioner.
Growing and work spaceNursery, crop access, harvest, packing, storage and equipment service access.Farm and design team.
Climate and lightFacility context, possible crops and environmental equipment questions.Appropriate growing or design specialist.
Site approvalsKnown requirements and who will confirm their applicability to this project.Relevant local authority or adviser.
InterruptionsCritical equipment duties, existing local protections and response arrangements.Equipment and operations team.

This is a preparation worksheet. It does not approve a site or establish electrical ratings, environmental targets, legal requirements or code compliance.

Separate the evidence from the question.

A

Known evidence

Name the source and its date. A site drawing, test report or equipment document is more useful than an unqualified estimate.

B

Missing evidence

Write the unresolved question and the design decision it affects. Leave capacity and suitability unconfirmed until assessed.

C

Person to consult

Identify the responsible reviewer and the information they need. Do not treat an informal discussion as an approval.

Illustrative evidence gap Β· not a site assessment

Known: a proposed water source is identified. Missing: suitable test evidence and a project-specific assessment. Next question: who will assess the water before the nutrient-water arrangement is chosen?

Make the next site conversation specific.

I have organized…

Mark the points you have prepared. These checks stay on this page and are not sent to COAgri.

0 of 7 points marked

Use this to organize a discussion. A completed checklist does not approve a design, site or operating procedure.

Connect these findings to the project brief. The Turnkey Farms page explains how site discovery fits into the planned complete build.

Planning aid Β· COAgri is in development

Use these questions to organize discovery. Equipment choices, design, operating procedures and service terms follow assessment of the actual project.

Continue planning

The next question may be in another guide.

All planning guides

Your next step

Keep the useful questions in your farm brief.

Create a local brief with what you know and what still needs assessment. Review or download it for your own planning; nothing is sent to COAgri.

Build your farm brief